The ____ for a remodel must show the size of the job site, the street, easements, setbacks, and the footprint of the existing structure, including decks.
A. foundation plan
B. floor plan
C. site map
D. site plan
Answer: D
Trades & Technology
You might also like to view...
Voltage applied to the diac must reach a predetermined level before the diac will activate.
Answer the following statement true (T) or false (F)
Trades & Technology
Planning a generator design to produce a given emf involves a sensible choice of ____ and takes into account any special demands on the generator in use.
a. webers, flux, rpm, and type of winding b. urns, flux, and type of compounding c. urns, rpm, and type of magnets d. urns, flux, rpm, and type of winding
Trades & Technology
Ducts up to 60 inches wide must be supported with _____
a. angle iron b. trapeze hangers c. strap hangers d. heavy gauge wires
Trades & Technology
Tapered roller bearings usually requires preloading? T
a. true b. false
Trades & Technology