Performing quantity takeoffs for construction projects that include ____ involves determining the number and type of items such as steel columns, beams, lintels, mullions, base plates, anchor bolts, beam seats, and beam connecting plates.
A. poured-in-place walls and columns
B. laminated beams and girders
C. structural steel
D. conventional materials
Answer: C
Trades & Technology
You might also like to view...
What are two reasons why a design professional would carry professional liability insurance, even if it was not required by his contract with an owner?
What will be an ideal response?
Trades & Technology
What is a squab?
What will be an ideal response?
Trades & Technology
The newly matured egg leaves the follicle and enters the ____________________ tube, which leads from the ovary to the uterus
Fill in the blank(s) with correct word
Trades & Technology
A fin straightener, also commonly known as a __________, is used to straighten the aluminum fins on condenser or evaporator coils that have become bent or slightly damaged.
What will be an ideal response?
Trades & Technology