What welding procedure specification is called out on this set of drawings?

Refer to Drawing Numbers T6592ML R0, T6593ML R0, and T6594ML R0.


101.5

Trades & Technology

You might also like to view...

A technician was getting paid $12.80 an hour. The boss decided to give him a 5% raise. What was his new hourly wage?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

If you wanted to find a soil where physical weathering dominated over chemical breakdown you would be most apt to find it in:

A) a coastal plain area of Delaware. B) a desert region of Arizona. C) a lacustrine deposit in Minnesota. D) a humid region in Brazil. E) the hill lands of Georgia.

Trades & Technology

An area that must be inspected before work activities proceed is a _____

a. mismatch b. root gap c. hold point d. root pass

Trades & Technology

Copper tubing that comes in rigid, straight lengths is called:

A) Tempered copper. B) Hard copper. C) Soft copper. D) ACR copper.

Trades & Technology