What are the actions involved in the LCP link configuration process?
What will be an ideal response?
The LCP link configuration process includes the following actions:
• Link establishment-PPP must open and configure the PPP connection before any data can be transferred over the link.
• Authentication (optional)-CHAP or PAP can be used to verify the identity of the devices that are establishing the connection.
• Link-quality determination (optional)-Checks the quality of the link and monitors its reliability
• Network layer protocol configuration negotiation-Identifies the appropriate Network layer protocol for the connection; the devices negotiate to use a protocol that is common to both.
• Link termination-When the call is complete, or the specifications defining the call are no longer met, the call is terminated.
You might also like to view...
When you want the home page to link to pages dedicated to specific topics, you should use the ____.
A. augmented linear structure B. linear structure C. mixed structure D. hierarchial structure
Identify the letter of the choice that best matches the phrase or definition.
A. Governs the order, structure, and use of words in a sentence of code B. A complete sentence in ActionScript C. The kind of language Flash uses to add interactivity to buttons D. A group of named, reusable statements that form a command E. A specific value that clarifies or limits a function
The show ip route command output is organized (at the highest level) by ________
A) Classful network B) Legend code C) Prefix length D) Administrative distance
To register the Active Directory schema snap-in, open a command prompt and type regsvr32 schmmgmt.dll
Indicate whether the statement is true or false