The four major phases of construction in order are:

A) Dried in, framing, foundation, and finish work. B) Foundation, framing, dried in, and finish work.
C) Foundation, dried in, framing, and finish work. D) Dried in, foundation, framing, and finish work.


B

Trades & Technology

You might also like to view...

What is interplanting? What is the reason for interplanting?

What will be an ideal response?

Trades & Technology

The seat height for a chair is determined by the ____.

A. popliteal height B. elbow rest height C. shoulder height D. hip breadth

Trades & Technology

The tolerance of the keyset width is .125 plus .002 minus .000. It is a ________ tolerance:

A) 0.002 inch "absolute" B) unidirectional C) unilateral D) bilateral

Trades & Technology

When a mobile crane is being moved without direction from the rigger, three travel signals from the crane's

horn mean the _____. a. boom is rising b. crane is stopping c. crane is moving forward d. crane is traveling in reverse

Trades & Technology