The four major phases of construction in order are:
A) Dried in, framing, foundation, and finish work. B) Foundation, framing, dried in, and finish work.
C) Foundation, dried in, framing, and finish work. D) Dried in, foundation, framing, and finish work.
B
You might also like to view...
What is interplanting? What is the reason for interplanting?
What will be an ideal response?
The seat height for a chair is determined by the ____.
A. popliteal height B. elbow rest height C. shoulder height D. hip breadth
The tolerance of the keyset width is .125 plus .002 minus .000. It is a ________ tolerance:
A) 0.002 inch "absolute" B) unidirectional C) unilateral D) bilateral
When a mobile crane is being moved without direction from the rigger, three travel signals from the crane's
horn mean the _____. a. boom is rising b. crane is stopping c. crane is moving forward d. crane is traveling in reverse