List some of the inspection points for rigging components.

What will be an ideal response?


Visual examination for defects; cracks, broken components, cuts, burns, etc. and verification of manufacturer’s safety tags; contact information, traceability, load capability, etc.

Trades & Technology

You might also like to view...

The standard scale of piping drawings is _____ inch = 1 foot.

a. 1/4 b. 3/8 c. 5/8 d. 3/4

Trades & Technology

A vehicle is being inspected under an OBD-II testing program and the MIL is ON. What will be the results of the inspection?

A) The vehicle will receive an 80% pass rate B) The vehicle will pass the test C) The vehicle will fail the test D) None of these

Trades & Technology

What material is used for high performance bushings on FWD cars?

What will be an ideal response?

Trades & Technology

Presently in the United States, certification is required by law.

Answer the following statement true (T) or false (F)

Trades & Technology