The pipe braces that support concrete tilt-up walls are typically removed when ________.

A) all wall panels have been erected, anchored to the footings, the floor and roof structures
have been completed, and the exterior finish to wall panels has been applied.
B) all wall panels have been erected, anchored to the footings, and the floor and roof
structures have been completed.
C) all wall panels have been erected, anchored to the footings, and the floor structures have
been completed.
D) all wall panels have been erected.
E) all walls panels have been erected and anchored to the footings.


A) all wall panels have been erected, anchored to the footings, the floor and roof structures
have been completed, and the exterior finish to wall panels has been applied.

Trades & Technology

You might also like to view...

What is the difference between collision detection and collision avoidance?

What will be an ideal response?

Trades & Technology

Find the average signal power of these signals.

a) x(t) = 4 rect(t) * ?4(t) (b) x(t) = 4 tri(t) * ?4(t)

Trades & Technology

Explain how modern technology has changed wind power

What will be an ideal response?

Trades & Technology

The ____ is a door that can be closed to prevent heat from escaping up the chimney when the fireplace is not in use.

A. damper B. dump C. conduit D. closeout

Trades & Technology