Write the formulation for this linear program

A company producing a standard line and a deluxe line of dishwashers has the following time requirements (in minutes) in departments where either model can be processed.

Standard Deluxe
Stamping 3 6
Motor installation 10 10
Wiring 10 15

The standard models contribute $20 each and the deluxe $30 each to profits. Because the company produces other items that share resources used to make the dishwashers, the stamping machine is available only 30 minutes per hour, on average. The motor installation production line has 60 minutes available each hour. There are two lines for wiring, so the time availability is 90 minutes per hour.

Let x = number of standard dishwashers produced per hour
y = number of deluxe dishwashers produced per hour


Answer: Max 20x + 30y
s.t 3x + 6y ≤ 30
10x + 10y ≤ 60
10x + 15y ≤ 90

Business

You might also like to view...

Visual or sound effects added to text or objects on slides are called ____________________

Fill in the blank(s) with correct word

Business

A sample of 61 elements is selected to estimate a 95% confidence interval for the variance of the population. The chi-square values to be used for this interval estimation are

A. 40.482 and 83.298. B. 32.357 and 71.420. C. 34.764 and 67.505. D. 43.188 and 79.082.

Business

Answer the following statement(s) true (T) or false (F)

1. The proportion of scores below z = .5 is .0000.
2. z = 1.75 is the 4th percentile.
3. z = -2.00 is the 2nd percentile.
4. If x ? = 8.5, and s = 1, 6.68% of scores are above x = 10.
5.

Business

Which of the following is NOT a benefit of ERP: ____.

A. improved access to data throughout the enterprise with less redundancy B. elimination of outdated disparate systems C. streamlined work processes D. dependence on one vendor

Business