Why is the length of time it will take to complete the project so important in determining the overhead costs?
What will be an ideal response?
The length of time to complete a project particularly affects the cost of job overhead because the longer it takes to complete a project the longer the contractor will be paying the salaries associated with job overhead, such as superintendents, how long an office will be required at the site as well as increased cost for utilities and sanitation facilities.
You might also like to view...
Net positive suction head (NPSH) is which of the following?
A) The inlet pressure required to prevent cavitation. B) The pressure at the inlet of a pump at maximum speed. C) The height to which a self-priming pump can draw upward.
In creating a(n) ____, a hue is chosen on the color wheel, then two hues on either side of the direct
complement are chosen.
a. split-complementary scheme c. polychromatic scheme b. analogous color scheme d. diversified color scheme
A flip-flop is also referred to as a ________ multivibrator
Fill in the blank(s) with correct word
The complexity of the residence determines which _____ are required.
A. bubble drawings B. BIM drawings C. working drawings D. preliminary drawings