A construction crew is building a house and the project is
complete on the first of the month. If the project is
complete on the last day of the month, what fraction of the building project did the crew complete during the month?
A.
B.
C.
D.
E.
Answer: D
You might also like to view...
Solve the inequality and graph the solution on the real number line.
?
?
A.
B.
C.
D.
E.
Solve the problem.An amusement park has a Ferris wheel with a height of 94 meters and a diameter of 88 meters. Using the drawing, write the equation of the wheel.
A. x2 + y2 = 442 B. x2 + (y - 50)2 = 882 C. x2 + (y + 50)2 = 442 D. x2 + (y - 50)2 = 442
Solve the problem.The accompanying graph shows the average number of degrees above/below normal in December from 2000-2009 where x = 0 represents 2000. Estimate the number of degrees above zero in 2003. Round to the nearest tenth.
A. 23.6 degrees above normal B. 1.1 degrees above normal C. 60.8 degrees above normal D. 3.4 degrees above normal
Find the volume generated by revolving about the x-axis the regions bounded by f (x) = e2x , x = 0 , and x = 5 .
What will be an ideal response?