A product consists of three components with reliabilities of 0.95, 0.95, and 0.95, respectively. The second component has a backup with a reliability of 0.95. Calculate and indicate product reliability.
A. 0.90%
B. 0.87%
C. 0.76%
D. 0.83%
A. 0.90%
You might also like to view...
Virtually every salesperson follows the personal selling process to recruit new business
Indicate whether the statement is true or false
Information collected and published by finance professor Aswath Damodaran consistently demonstrates that, within industries, the price to book value ratio is GREATER than the EV to EBITDA ratio
Indicate whether the statement is true or false
Fremont Systems produces two different products, Product A, which sells for $1,000 per unit, and Product B, which sells for $2,000 per unit, using three different activities: Design, which uses Engineering Hours as an activity driver; Machining, which uses machine hours as an activity driver; and Inspection, which uses number of batches as an activity driver. The cost of each activity and usage of the activity drivers are as follows: CostUsage by Product AUsage by Product BDesign (Engineering Hours)$150,000 400 600 Machining (Machine Hours)$5,000,000 2,000 6,000 Inspection (Batches)$300,000 90 30 Fremont manufactures 10,000 units of Product A and 7,500 units of Product B per month. Each unit of Product A uses $500 of direct materials and $200 of direct labor, while each
unit of Product B uses $750 of direct materials and $350 of direct labor.Required: a. Calculate the Design activity proportions for Products A and B.b. Calculate the Machining activity proportions for Products A and B.c. Calculate the Inspection activity proportions for Products A and B.d. Determine the indirect costs assigned to Product A.e. Determine the indirect costs assigned to Product B.f. Determine the manufacturing cost per unit for Product A.g. Determine the manufacturing cost per unit for Product B.h. Determine the gross profit per unit for Product A.i. Determine the gross profit per unit for Product B. What will be an ideal response?
To revise the project plan to implement the best solution to a problem, the persons and resources needed for each task must also be identified
a. True b. False Indicate whether the statement is true or false