The first electrical checks of a system that is not operating generally involve:

A) Replacing all system capacitors. B) Checking the power circuit to the equipment.
C) Adding refrigerant. D) Ohming out key components.


B

Trades & Technology

You might also like to view...

The anchor shown is called a(n) _____.



a. sleeve anchor
b. toggle bolt
c. expandable anchor
d. drive anchor

Trades & Technology

How many ignition coils should you expect to find on a V6 engine using a waste spark system?

A) Two B) Three C) One D) Six

Trades & Technology

In order to decode a multiplexer from a remote location, a ________ must share the same address or select bits

Fill in the blank(s) with correct word

Trades & Technology

If a concrete masonry lintel measuring 8" x 8" x 5.5' weighs 275 pounds, what is the weight in pounds per linear foot of such a lintel?

What will be an ideal response?

Trades & Technology