Technician Makena worked 8
? hr., 9
hr., 8
hr., 9 hr., and 8
middle;" alt="" src="https://sciemce.com/media/3/ppg__cognero__Unit_17_Averages__media__3d8c650c-eb45-4615-88f8-3706301667e5.PNG" data-wiris-created="true" /> hr. one week. What was the length of an average workday for Makena that week?
Fill in the blank(s) with the appropriate word(s).
8 hours
Trades & Technology
You might also like to view...
All fuel oil piping should slope back to the tanks at least _____ inch per foot.
a. 1/16 b. 1/8 c. 1/4 d. 1/2
Trades & Technology
For the reaction of butane burned with stoichiometric air, the dew-point temperature of the products is nearest (assume Patm = 100 kPa):
A) 44°C B) 48°C C) 51°C D) 54°C
Trades & Technology
In building elevations, the surface of the ground is shown by a ____ line.
A. grade B. girder C. dimension D. hidden
Trades & Technology
Pictorial drawing a form of drawing that shows an object's depth. Three sides of the object can be seen in one view.
Answer the following statement true (T) or false (F)
Trades & Technology