When a CR high pressure line is removed for any reason, which of the following steps is required by most engine OEMs?

A. remove and replace the line nuts
B. torque the line nuts to spec
C. dress the sealing nipples on a grinder
D. replace the high pressure line


Answer: D

Trades & Technology

You might also like to view...

To finish 1,800 square feet of drywall using conventional dry-powder joint compounds would require approximately _____.

a. 83 lbs b. 128 lbs c. 150 lbs d. 177 lbs

Trades & Technology

One of Stephen Douglas's mistakes in proposing the Kansas-Nebraska Act was

A. not securing the transcontinental railroad for the North. B. overestimating the protest to the bill. C. allowing slavery to spread into new territory. D. underestimating the depth of northern opposition to the spread of slavery. E. believing that slavery could not survive in Kansas.

Trades & Technology

Joint geometry has two elements to it - shape and _____.?  

A. dimensions? B. groove? C. angle? D. face?

Trades & Technology

When contacts are tested to be out of specification, they should be cleaned.

Answer the following statement true (T) or false (F)