Where an orderly shutdown is required to minimize the personnel/equipment hazard(s), a system of coordination based on the following two conditions is permitted: (1) coordinated short-circuit protection and (2) ____.
A. overload indication based on monitoring systems or devices
B. coordinated service (a single main feeder line)
C. a single switching source
D. integrated circuitry
Answer: A
You might also like to view...
What tests can a technician perform on an oil furnace that will check the combustion efficiency?
What will be an ideal response?
Cells that have a nucleus are defined as prokaryotic cells
Indicate whether the statement is true or false
When choosing an electric meter, it is important to use the proper category rating:
A) For both the meter and the leads. B) For the meter leads. C) For either the meter or the leads–neither is necessary. D) For the meter.
The abbreviation for countersink is ____________________.
Fill in the blank(s) with the appropriate word(s).