Where an orderly shutdown is required to minimize the personnel/equipment hazard(s), a system of coordination based on the following two conditions is permitted: (1) coordinated short-circuit protection and (2) ____.

A. overload indication based on monitoring systems or devices
B. coordinated service (a single main feeder line)
C. a single switching source
D. integrated circuitry


Answer: A

Trades & Technology

You might also like to view...

What tests can a technician perform on an oil furnace that will check the combustion efficiency?

What will be an ideal response?

Trades & Technology

Cells that have a nucleus are defined as prokaryotic cells

Indicate whether the statement is true or false

Trades & Technology

When choosing an electric meter, it is important to use the proper category rating:

A) For both the meter and the leads. B) For the meter leads. C) For either the meter or the leads–neither is necessary. D) For the meter.

Trades & Technology

The abbreviation for countersink is ____________________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology