What are the suggested interim fee payments for design professionals according to the 1977 B141a (“Instruction Sheet”) Document?

What will be an ideal response?


The suggested interim fee payments are (1) schematic design phase – 15%,
(2) design development phase – 35%, (3) construction documents phase –
75%, (4) bidding or negotiation phase – 80%, and (5) construction phase –
100%

Trades & Technology

You might also like to view...

Technician A says that the starter control circuit includes the ignition switch, neutral safety (clutch) switch, and solenoid. Technician B says that the power circuit includes the battery, battery cables, solenoid, and starter motor. Who is right?

A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B

Trades & Technology

Site-related drawings should be stored in multiple files only if each drawing is stored on a separate layer.

Answer the following statement true (T) or false (F)

Trades & Technology

Two terms from NEC Article 100 that trainees should become familiar with are _____

a. labeled and categorized b. labeled and Listed c. Listed and outlined d. Listed and summarized

Trades & Technology

What does the Uniform Tire Quality Grading system (UTQG) include?

What will be an ideal response?

Trades & Technology