Which of the following steps is not a correct part of the empirical program development process?

A) Enter the SLC 500 ladder logic diagram by creating the rung(s) with the correct input logic and output instruction, then document the solution based on company standards.
B) Complete a wiring diagram with module slots and pin numbers for a PLC 5 or SLC 500 design. For Logix the tag names for inputs and output are declared and entered.
C) List rungs with the least complex rungs first, progressing to the most complex rungs at the bottom of the ladder logic program.
D) Test the solution to see if it meets the specified control requirements.


C

Trades & Technology

You might also like to view...

An object is let fall from an airplane flying horizontal to the earth’s surface. How far does it fall before a speed of 20 m/s is reached? Neglect the air friction as a first approximation.

A) 20 m B) 18 m C) 16 m D) 14 m

Trades & Technology

All of the following are popular choices for bird hunting except:

a. Quail c. Pheasant b. Ostrich d. Turkey

Trades & Technology

If one brick is 2.25 inches high, how high in inches is a stack of 13 bricks?

What will be an ideal response?

Trades & Technology

________ are required for any food that is not in its original form.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology