Which one of the following troubleshooting techniques is NOT useful for sequencer problems?

A) When troubleshooting a sequencer problem with a large database having many elements, start with just a small data set.
B) If an SQO instruction is used with a timed input, then replace the timed input with a manual switch or forced input instruction to manually step through the sequencer file while all the sequencer outputs and machine actions are verified.
C) Verify the instruction parameters, especially the length value.
D) In applications where the sequencer instruction is false during the first PLC scan, verify the 0 position was included in the length value.


D

Trades & Technology

You might also like to view...

A photovoltaic farm has 97 panels.  Each panel has 6 supports anchored 46 inches into the ground.  Find, in inches?, the total depth of holes needed to be dug for the anchors.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

?Explain what happens, on the molecular level, in the primary and secondary combustion of acetylene.

What will be an ideal response?

Trades & Technology

What two things are accomplished in the condenser?

A) Remove latent heat B) Recycle the gas back to a liquid C) Both A and B D) Neither A nor B

Trades & Technology

Find the numerical values of

Trades & Technology