A methodology and formal development strategy for the design and implementation of an information system is referred to as a __________.
A. systems design
B. development life project
C. systems development life cycle
D. systems schema
Answer: C
You might also like to view...
Project managers use planning software such as Project 2013 to prevent deviating from the scope of a project
Indicate whether the statement is true or false
The installation error message ?RAID Array Not Detected? could indicate _______________.
A. that the RAID array needs configuring B. that the drives are not properly formatted C. the lack of the proper driver for the hard drive D. the lack of support for RAID by the operating system
Alice has a When a key is typed event that will cause a method to run whenever a particular key is pressed.
Answer the following statement true (T) or false (F)
Which of the following BEST describes the difference between layer 2 switching and layer 2 routing?
A. Switching moves packets between hosts on different subnets, and routing moves packets between hosts on the same subnet. B. Routing moves packets between hosts on different subnets, and switching moves packets between hosts on the same subnet. C. Both routing and switching move packets between hosts on the same subnet, but routing does so at a faster pace. D. Both routing and switching move packets between hosts on different subnets, but switching does so at a faster pace.