Cuando se construyen pisos de concreto para varias plan- tas, por lo general el apunta- lamiento se instala debajo de las últimas _____ losas de piso que se hayan retirado más recientemente de sus sistemas de apuntalamiento.

a. una
b. dos
c. tres
d. cuatro


Answer: B

Trades & Technology

You might also like to view...

Matching Type

1. Cutting Edge 2. Boundary 3. Intersection 4. Acquired point 5 .Crossing Window a. Extend b. Trim c. Object Snap d. Stretch e. Object Snap Tracking

Trades & Technology

Tube cutters are used to ____.

A. cut insulation for tubing B. cut iron pipe used for natural gas or liquefied petroleum gas C. cut copper tubing D. cut sheet metal duct

Trades & Technology

A land development company is considering the purchase of earth-moving equipment. This equipment will have an estimated first cost of $190,000, a salvage value of $70,000, a life of 10 years, a maintenance cost of $40,000 per year, and an operating cost of $260 per day. Alternatively, the company can rent the neces­sary equipment for $1100 per day and hire a driver at $180 per day. (a) If the company’s MARR is 10% per year, how many days per year must the company need the equipment in order to justify its purchase? (b) When approached to rent for the breakeven number of days, the equipment owner indicated that the minimum rental is for 100 days per year; however, he might consider a lower daily rental cost. What is the daily rental cost to justify renting over pur­chasing? If the

equipment was purchased, as­sume it would be used for the breakeven number of days. Use the Goal Seek or Solver tool to de­termine the required rental cost per day. What will be an ideal response?