Which of the following requirements must be met to allow new construction in a prevention of significant destruction area:

a. the owner must agree to install the best available control technology–as determined by the EPA–on the new plant to control its air pollution
b. the owner must show that the pollution from its plant will not cause the maximum allowable increase in the area to be exceeded
c. the owner must show how the plant will be economically beneficial to the area d. both a and b are required
e. a, b, and c are required


d

Business

You might also like to view...

Marcus works on an assembly line for a U.S. automobile manufacturer. He would be considered a(n) ______ of this system.   

A. participant B. feedback mechanism C. input D. transformation process E. output

Business

Explain some of the differences in accounting for operating assets that exist between U.S. GAAP and IFRS

Business

In multiple regression, the multiple R, also called the coefficient of determination, ranges from 0 to +1.00. It represents the amount of the dependent variable "explained" by the combined independent variables

Indicate whether the statement is true or false

Business

A committee has been formed to evaluate the jobs at LennoCorp. They have written each job title, with a list of its duties and responsibilities, on a separate index card. Now they are putting those cards in order of importance. This committee is using a job ranking system to evaluate the jobs.

Answer the following statement true (T) or false (F)

Business