Upon receiving an order for a Schedule II controlled substance, a supplier notices that the quantity ordered has been altered. Which of the following statements is true regarding alterations of an official DEA order form for Schedule II drugs?

Any alterations to the order form must be reported to the DEA
Any signs of alterations on the order form may be enough to allow the supplier to refuse the Schedule II controlled substance order
Any alterations to the DEA order form result in the pharmacy's ability to order Schedule II medications being revoked
Any alteration of an order form is not enough for the supplier to refuse the Schedule II controlled substance order


Any signs of alterations on the order form may be enough to allow the supplier to refuse the Schedule II controlled substance order

Rationale: For schedule II drugs, any signs of alterations on the order form (222) may be enough to allow the supplier to refuse the order. The DEA's official wording states that "A DEA Form 222 must not be filled if the order is not complete, legible, or properly prepared, executed, or endorsed – or if the order shows any alteration, erasure, or change of any description.".

Health Professions

You might also like to view...

Overlapping lesions are:

A) contiguous sites where the tumor continues from one site to an adjacent one without interruption. B) contiguous sites where the tumor continues from one site to another. C) sites that lie next to each other. D) contiguous sites where encapsulated tumors lie next to each other.

Health Professions

One of the most serious and potentially fatal effects of renal failure is:

A)Inability to excrete excess fluids B) Increased blood pressure C) Tinnitus D) The buildup of toxins within the body

Health Professions

Safety Data Sheets (SDS) are

A. only used in medical labs. B. only required after an OSHA violation. C. required in any business that has any hazardous material. D. only used in hospitals. E. sometimes used in medical offices.

Health Professions

A plumber fixes a leaky pipe in a medical practice late at night on September 23rd. He mails an invoice for services rendered to the medical practice that is received on September 29th and is due by October 14th. A check is written to pay the invoice on October 2nd. Under accrual accounting, what should be the posting date for the repair expense?

A. October 2nd B. September 23rd C. September 29th D. October 14th

Health Professions