In the process of __________, the estimated cost of each element in the cost plan is compared with the perceived value of that element to consider if the sum allocated to that component part of the building is justified.

A. budget analysis
B. budget accounting
C. value analysis
D. value accounting


Answer: C

Trades & Technology

You might also like to view...

A series circuit has three resistances: 12, 3, and 6 ohms. Circuit voltage is 14.3 volts. What is the total current flow in this circuit?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

The ordinates of the moment influence line at midspan B of a 2-span continuous beam are provided at every one-tenth of the span in Figure P12.56. (a) Position the AASHTO HL-93 design truck and lane loads in Figure 12.25f to produce the maximum moment. (b) Position the AASHTO HL-93 design tandem and lane loads shown in Figure 12.25(g) to produce the maximum positive moment. Which loading is more critical?

Trades & Technology

The first step to solving a problem is to _____

a. find a solution b. define it c. ask for help d. have a plan

Trades & Technology

What are fire rings designed to do as a cylinder head is torqued?

A. Stay rigid. B. Hold their shape for repeated use. C. Temporarily protect the cylinder bore flange until the head gasket makes a seal. D. Deform to create the best possible seal.

Trades & Technology