Your company marks up labor and materials 15 percent, equipment 20 percent, and subcontractor’s bids 4 percent to cover main-office overhead and profit. What is your company’s bid for the project?

Your company is bidding on an office building. The estimated construction costs are as follows:

Labor = $985,466
Materials = $1,091,256
Equipment = $100,754
Subcontractor’s bids = $6,254,800


The bid is calculated as follows:

Labor = $985,466 × 1.15 = $1,133,286

Materials = $1,091,256 × 1.15 = $1,254,944

Equipment = $100,754 × 1.20 = $120,905

Subcontractor = $6,254,800 × 1.04 = $6,504,992

Total = $1,133,286 + $1,254,944 + $120,905 + $6,504,992 = $9,014,127

Trades & Technology

You might also like to view...

A specific color that has been darkened through the addition of black is called what?

A. a shade B. a secondary C. CMYK D. a tint

Trades & Technology

Some possible explanations of physiological/morphological mechanisms that affect rootstock/scion relations include: ________, ________, ________, and ________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A vehicle battery is consistently low on voltage. Technician A says to disconnect the battery with the engine running to test for proper alternator output. Technician B says that a loose alternator belt may cause this problem. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Trades & Technology

The interior surfaces of ductwork offer resistance to airflow, reducing the __________ of the air moving through it and thus the air conditioning system's operating efficiency.

A. cleanliness B. density C. humidity D. velocity

Trades & Technology