Which of these building plans is most economical in the long term?



A) (100' × 100')
B) (30' × 330')


B) (30' × 330')

Trades & Technology

You might also like to view...

The bottom plate in a wood light-frame wall assembly is called a sole plate or sill plate. Explain the difference between the two terms.

What will be an ideal response?

Trades & Technology

The accounts payable clerk at White Industries just received a bill for insurance on the plant

that must be paid despite the fact that the plant has been shut down for the past two months. This is an example of what is called a

a. semivariable cost. b. variable cost. c. fixed cost. d. unilateral cost. e. inflexible cost.

Trades & Technology

Grounding of electrical equipment is the primary method of reducing electrical hazards.