If there is excessive idle time for equipment on the job, to what factors may this be attributed?
What will be an ideal response?
Factors which may contribute to excessive idle time for equipment on a project include bad weather, poor working conditions, and poor management which might include poor scheduling, poor field supervision, poor maintenance, and perhaps excessive equipment on the project.
You might also like to view...
In the identification mark on a CFS member "362S125-30 (33) G40", the number 30 implies that
A) it is a 30-ft-long member. B) it is a 30-in.-long member. C) the thickness of steel sheet used for the member is 0.030 in. D) the thickness of steel used for the member is gauge 30. E) none of the above.
A diode is a semiconductor device that ________
A) Causes voltage spikes B) Blocks current in both direction C) Reverses current flow D) Blocks current in one direction
Which type of chiller is more likely to freeze the tubes if charged or recovered improperly
A) flooded chillers B) screw chillers C) absorption chillers D) direct expansion chillers
In the event of a fire, fire dampers prevent oxygen from feeding the fire by:
A) Spraying suppressant foam. B) Limiting the amount of outside air to 10 percent. C) Closing off the outside air supply completely. D) Removing all oxygen from the space.