Solve the problem.A manufacturer uses raw materials to produce p products each day. Suppose that each delivery of a particular material is $d, whereas the storage of that material is x dollars per unit stored per day. (One unit is the amount required to produce one product). How much should be delivered every x days to minimize the average daily cost in the production cycle between deliveries?

What will be an ideal response?


If he asks for a delivery every x days, then he must order (px) to have enough material for that delivery cycle. The average amount in storage is approximately one-half of the delivery amount, or . Thus, the cost of delivery and storage for each cycle is approximately
 Cost per cycle = delivery costs + storage costs
 Cost per cycle = d +  ? x
We compute the average daily cost c(x) by dividing the cost per cycle by the number of days x in the cycle.
 c(x) =  + 
We find the critical points by determining where the derivative is equal to zero.
 c'(x) = -  +  = 0
 x = ± 
Therefore, an absolute minimum occurs at  days.

Mathematics

You might also like to view...

Find the volume of the indicated region by an iterated integration.The region that lies under the surface    and above the triangle enclosed by the lines  , and  

A. 30000
B.
C.
D.

Mathematics

Express the relationship between a small change in x and the corresponding change in y in the form .y = csc(2x2 - 1)

A. dy = -2x2 csc(2x2 - 1) cot(2x2 - 1) dx B. dy = 4x csc(2x2 - 1) cot(2x2 - 1)dx C. dy = -4x csc(4x) cot(4x) dx D. dy = -4x csc(2x2 - 1) cot(2x2 - 1) dx

Mathematics

Solve the system by the elimination method.  x - 5y = 4-5x - 5y = 40

A. {(2, -6)} B. {(-5, -3)} C. ? D. {(-6, -2)}

Mathematics

Identify the indicated submatrix.A = . Find A21.

A.
B.
C.
D.

Mathematics