If two sub-contractors come to the resident project representative or inspector with a heated argument about priority of their work, the resident project representative or inspector should:

A. settle the argument.
B. refer them to the general contractor's superintendent.
C. have the architect/engineer resolve the issue.
D. refer them to the construction manager.
E. ignore them both.


B

Trades & Technology

You might also like to view...

Use OSHA Form No. _____ to record accident information.

a. 300 b. 301 c. 306 d. 303

Trades & Technology

What is an advantage of going right instead of left around an obstacle

Cdl

Trades & Technology

The foundation for effective communication is ability that the other person understands where you are coming from and business are there to make a profit

Indicate whether the statement is true or false

Trades & Technology

Area measurements are used to measure:

A) Location within a city. B) The size of a floor. C) The space in a room. D) The distance between cities.