System testing:
A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
E) rolls system tests out to separate business divisions for independent results.
B
You might also like to view...
Refer to Figure 2.1. If the relative cost of aluminum were to rise, then the production possibilities frontier would
a. become steeper. b. become flatter. c. shift inward in a parallel manner. d. shift outward in a parallel manner.
Which of the following is an example of self-service technologies?
A) calling for a pizza delivery B) buying a service contract for a computer C) printing tickets from a home computer D) visiting a parts-and-service department E) offering secondary service features
Use italics to indicate ___________ words that have not been absorbed into English
a. technical b. hard-to-spell c. foreign d. archaic
The R2 (i.e., R-squared) varies from 0% to 100%, and the lower the percentage, the better the fit of the data to a straight line.
Answer the following statement true (T) or false (F)