Which of the following is a step in the typical start-up procedure of a boiler?

A. Inspect the outside of the boiler for loose flanges.
B. Shut off the fuel.
C. Shut off the steam.
D. Gradually reduce the firing and the process flow.


A. Correct. Inspecting the outside of the boiler for loose flanges is a step in the start-up procedure for a boiler.
B. Incorrect. Shutting off the fuel is not a step in the start-up procedure for a boiler.
C. Incorrect. Shutting off the steam is not a step in the start-up procedure for a boiler.
D. Incorrect. Gradually reducing the firing and the process flow is not a step in the start-up procedure for a boiler.

Trades & Technology

You might also like to view...

What kind of brakes do the most newer heavy duty trucks use

Air brakes

Trades & Technology

Resistors are used for three main purposes in an electrical circuit. Resistors limit the current flow through a circuit, divide voltage, and _____?

A. store energy B. give off heat C. permit current to flow in only one direction D. amplify voltage

Trades & Technology

In most states, the parties to a construction contract can agree to resolve disputes through binding arbitration

A. with the consent of the parties only after a dispute actually arises. B. at the time of signing the construction contract. C. only if neither party chooses to litigate in court. D. only on disputes of less than $50,000. E. none of the above.

Trades & Technology

Given matrices:

Trades & Technology