A manufacturing firm makes a production run of 3,750 pieces. Each piece is 78.30 millimeters long. The cost of material per meter of length is $2.40. Allowing 10% for waste and scrap, what is the material cost for the 3,750 pieces? Round to nearest dollar.
Fill in the blank(s) with the appropriate word(s).
$775.00
You might also like to view...
Shortening the pipe run when it is installed so that when the pipe heats up it expands to its intended length is known as _____.
a. cold springing b. hot springing c. an expansion guide d. flexibility in layout
The working load limit of a chain is usually equivalent to what percentage of the tensile strength rating of the steel it is made of?
A. 25 percent B. 50 percent C. 75 percent D. 100 percent
Technician A says that a tempered frame rail repair that has failed by cracking cleanly through the center of what visually appears to be a good weld could be caused by using the incorrect filler rod. Technician B says that cracks that appear at the sides of what appears to be a good weld on a tempered frame rail can be caused by crystallization. Who is correct?
A. Technician A only B. Technician B only C. Both A and B D. Neither A nor B
Technician A says that when spraying coatings to full wet, the possibility of developing runs becomes greater. Technician B says that when spraying larger areas, the technician should choose a clear that cures at a slower pace. Who is correct?
A. Technician A only B. Technician B only C. Both Technicians A and B D. Neither Technician A nor B