El concreto de una planta central de mezclado es _____.
a. mezclado casi completa-
mente antes de abandonar
la planta
b. mezclado en la obra de
construcción
c. mezclado en un camión
mezclador después de
abandonar la planta
d. un tipo de concreto de
mezcla seca
Answer: A
You might also like to view...
There are four methods that may be used to install a turfgrass planting
Indicate whether the statement is true or false
As the current in the stator circuit increases, the stator ____________________ also increases.
Fill in the blank(s) with the appropriate word(s).
A driver of a vehicle equipped with a rack and pinion steering gear complains that the steering wheel jerks whenever the vehicle is being driven into a curbed driveway. Technician A says that the rack and pinion gears may have too little clearance between the teeth of the gears. Technician B says that a lack of lubrication of the rack and pinion is the most likely cause. Which technician is
correct? A) Technician A only B) Technician B only C) Both technicians D) Neither technician
The flame produced by MAPPTM (methylacetylene-propadiene) is at a temperature of about __________.
A. 3600°F B. 5300°F C. 5600°F D. 6600°F