When reinstalling the worm gear assembly, the blanking plug must be ________ into place

A) screwed B) pressed C) bolted D) glued


B

Trades & Technology

You might also like to view...

Repeat Problem 20-19, using the PCA design method, if the subgrade k value is 50 and a 6-inch stabilized subbase is used. The modulus of rupture of the concrete is 600 lb/in2 and the pavement has aggregate interlock joints (no dowels) and a concrete shoulder.

What will be an ideal response?

Trades & Technology

Which of the following statements is true about the requirements for bonding in hazardous (classified) locations?

A. No special requirements for bonding exist so long as an effective ground-fault return path is provided. B. Metal conduit is not required to be bonded so long as an equipment grounding conductor is installed inside for bonding equipment. C. Bonding is required from the hazardous location equipment to the source of a separately derived system. D. All the methods for bonding service equipment in 250.92(B)(1) through (4) are permitted to be used for bonding.

Trades & Technology

Moving and renaming a file are essentially the same operation.

Answer the following statement true (T) or false (F)

Trades & Technology

Describe a feature control frame.

What will be an ideal response?

Trades & Technology