The heat anticipator in the thermostat control circuit in the heating mode is active when the ____.
A. heating contact is open
B. heating contact is closed
C. fan switch is open
D. fan switch is closed
Answer: B
You might also like to view...
The free fall test is a standard check for ________.
A) Accumulators B) Check balls C) Shift solenoids D) Shift valves
Material prices are determined from suppliers who are required to quote prices to supply and deliver items that meet specifications.
Answer the following statement true (T) or false (F)
A _________________ is a linear actuator in which hydraulic force is converted into mechanical energy.
Fill in the blank(s) with the appropriate word(s).
Thirty-four steel boxes are used for a certain wiring job. In each box, five 1-inch holes are drilled. In twenty-three of the boxes, two 13/4-inch holes are drilled, and the remaining boxes have three 11/2-inch holes drilled in them. How many holes are drilled in all the boxes?
Fill in the blank(s) with the appropriate word(s).