In organizations where projects are managed within a ________, the team member's area manager, not the project manager, is responsible for assessing performance.
A. Flat organization
B. Functional organization
C. Strong organization
D. Matrix organization
E. Project organization
Answer: B
You might also like to view...
All parties are discharged from liability on a negotiable instrument when ________
A) the instrument is presented for payment B) the signature of the indorser is intentionally struck out C) the instrument is accidentally destroyed or mutilated D) a drawee in good faith pays an unaccepted instrument in full to the holder
The average lifetime of a light bulb is 3,000 hours with a standard deviation of 696 hours. A simple random sample of 36 bulbs is taken.
a.What are the expected value, standard deviation, and shape of the sampling distribution of ?b.What is the probability that the average life in the sample will be between 2,670.56 and 2,809.76 hours?c.What is the probability that the average life in the sample will be greater than 3,219.24 hours?d.What is the probability that the average life in the sample will be less than 3,180.96 hours?
What will be an ideal response?
Nancy owned business equipment with a $16,950 adjusted basis and a $7,500 FMV that was destroyed by a tornado. The equipment was uninsured. As a result of this casualty, Nancy:
A. Recognizes a $7,500 Section 1231 loss B. Is allowed to deduct a $7,500 ordinary loss C. Is allowed to deduct a $16,950 ordinary loss D. Recognizes a $16,950 Section 1231 loss
Anita owes Brad $75,000 . Brad signs a written statement granting Cal a gratuitous assignment of his rights from Anita. If Brad dies prior to delivering the statement to Cal:
a. Brad's death has no effect on the assignment. b. the assignment is terminated upon Brad's death. c. the signing of the statement makes the assignment irrevocable. d. the assignment is invalid, because it is gratuitous.