In mechanical drafting dashed lines are called ____ lines.
A. invisible
B. marking
C. hidden
D. dimension
Answer: C
You might also like to view...
After checking any control circuit fuses or breakers when troubleshooting heat pump wiring, which of the following should be checked?
a. Terminations and wire nuts b. Primary voltage at the transformer c. Wire sizes d. Secondary voltage at the transformer
A ____________________ is a device that consists of spikes on a revolving drum that passes through slots and separates lint from seeds
Fill in the blank(s) with correct word
____ is a low-level language that provides maximum access to all the computer's devices, both internal and external.
A. C B. C++ C. Assembly language D. Awk
In the MARK column of a door schedule, the third door on Floor 2, Wing B, would likely be designated as
_____. a. 3-2-B b. 203-B c. B-203 d. 200-3-B