Factor the trinomial.u2 - 12u + 27

A. (u + 3)(u - 9)
B. (u - 3)(u - 9)
C. (u - 3)(u + 9)
D. (u + 3)(u + 9)


Answer: B

Mathematics

You might also like to view...

Divide numerator and denominator by the highest power of x in the denominator to find the limit.

A. 9 B. 81 C. does not exist D. 729

Mathematics

The Acme Class Ring Company designs and sells two types of rings: the VIP and the SST. They can produce up to 24 rings each day using up to 60 total man-hours of labor. It takes 3 man-hours to make one VIP ring, versus 2 man-hours to make one SST ring.How many of each type of ring should be made daily to maximize the company's profit, if the profit on a VIP ring is $40 and on an SST ring is $35?

A. 16 VIP and 8 SST B. 12 VIP and 12 SST C. 14 VIP and 10 SST D. 18 VIP and 6 SST

Mathematics

Solve the problem.Suppose that f and g are continuous and that  and   

A. -75 B. 39 C. -51 D. -15

Mathematics

A toy making company has at least 300 squares of felt, 700 oz of stuffing, and 230 ft of trim to make dogs and dinosaurs. A dog uses 1 square of felt, 4 oz of stuffing, and 1 ft of trim. A dinosaur uses 2 squares of felt, 3 oz of stuffing, and 1 ft of trim.It costs the company $1.01 to make each dog and $1.33 for each dinosaur. The company wants to minimize its costs. What are the coefficients of the dual objective function?

A. 1, 4, 1 B. 300, 700, 230 C. 1, 2, 1.01 D. 1.01, 1.33

Mathematics