If more work is approved, the repair order will enter which of the following phase?
A. Check out
B. Additional work
C. More work
D. Remain in the second phase
B. Additional work
You might also like to view...
Answer the following statement(s) true (T) or false (F)
1. Where a radius is specified, the part surface may have flats and reversals, as long as the arc surface is located within the tolerance zone. 2. The counterbore symbol indicates the min size of the flat on a flat-bottomed diameter. 3. The countersink symbol denotes the shape of geometry on a part. 4. The symbol for a reference dimension is a set of parentheses. 5. The model coordinate system symbol is optional on CAD models, but is required on orthographic views of an engineering drawing.
The company Slack stands for ‘Searchable List of All Contacts and Knowledge.'
Answer the following statement true (T) or false (F)
Parasitic flowering plants lack root systems and instead absorb water nutrients through organs called ____________________
Fill in the blank(s) with correct word
Which of the following statements regarding cooling tower operations is correct?
A) When the water evaporates from the wet-bulb thermometer, the temperature rises. B) The cooling tower operation depends on the dry-bulb temperature. C) On very dry days, the cooling tower can cool the water below the wet-bulb temperature. D) On dry days, the cooling tower can cool the water temperature below the ambient temperature.