What is the FIRST step if an inspector finds negative conditions at a construction or demolition site?
A. Close site until contractor complies
B. Formal citations filed against contractor
C. Notify police department and shut down all access to site
D. Notify contractor and ensure conditions are returned to approved design
D
You might also like to view...
Which construction type is composed of building materials that will not contribute to fire development or spread?
A. Type I B. Type II C. Type III D. Type IV
The best way to avoid diverticulosis is to eat a diet high in ________.
A. protein B. fiber C. fish D. fruit
For distal extremities, how much minimum light field should be around every side of the anatomy?
A. inch
B. 1 inch
C. inches
D. 2 inches
The physician orders promethazine (Phenergan®) 25 mg IM for a patient with nausea. The promethazine bottle is labeled "50 mg per mL.". How much of this drug should be administered to the patient?
0.5 mL 1 mL 1.5 mL 2.5 mL