Which standard construction documents provide forms for processing change orders?

What will be an ideal response?


The Engineers Joint Contract Documents Committee (EJCDC) Document 1910-8 provides a Work Directive Change Order form, the EJCDC Document 1910-8 includes a Field Order Change form that authorizes contractors to perform minor changes to the contract if changes will not alter the contract price or time and these do not have to be signed by the owner, the American Institute of Architects (AIA) Document A201, Construction Change Authorization form, that is also used by some engineers to authorize changes and to instruct contractors to proceed with the changed work.

Trades & Technology

You might also like to view...

¿Cuál de los siguientes elementos no describe una ubicación de tubería de vapor elevada?

a. Tubo elevado b. Tubo de subida c. PRV d. Bastidor para tuberías

Trades & Technology

____________________ is the relationship between volts, amperes, and resistance in a circuit.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

If an overhang is specified at the rakes, horizontal structural members called ____ must be installed.

a. web stiffeners b. wall plates c. lookouts d. headers

Trades & Technology

In blood smear preparations, blood is collected from which type of vessel?

A) veins B) peripheral capillaries C) arteries D) lymphatic ducts E) venules

Trades & Technology