Solve the problem.A ceramics workshop makes wreaths, trees, and sleighs for sale at Christmas. A wreath takes 3 hours to prepare, 2 hours to paint, and 9 hours to fire. A tree takes 14 hours to prepare, 3 hours to paint, and 4 hours to fire. A sleigh takes 4 hours to prepare, 14 hours to paint, and 7 hours to fire. If the workshop has 88 hours for prep time, 56 hours for painting, and 102 hours for firing, How many of each can be made?
A. 8 wreaths, 4 trees, 2 sleighs
B. 9 wreaths, 5 trees, 3 sleighs
C. 2 wreaths, 8 trees, 4 sleighs
D. 4 wreaths, 2 trees, 8 sleighs
Answer: A
Mathematics
You might also like to view...
Simplify using order of operations.9(-4 + 6) - (6 - 9)
A. -27 B. 27 C. -21 D. 21
Mathematics
If the length of the hypotenuse of a 45°–45° right triangle is 7.3 cm, find its area and perimeter to the nearest hundredth.
What will be an ideal response?
Mathematics
Solve the inequality. < 5
A. or
B. or
C. or
D.
Mathematics
Determine the constant that should be added to the binomial so that it becomes a perfect square trinomial. Then write and factor the trinomial.x2 - x
A. ; x2 -
x +
=
2
B. ; x2 -
x +
=
2
C. ; x2 -
x +
=
2
D. ; x2 -
x +
=
2
Mathematics