If a discrepancy is discovered which makes literal interpretation of the plans and specifications impossible, the owner/engineer's resident project representative or inspector should:
A. tell the contractor to "cut-to-fit" and "beat-to-shape" until everything fits OK.
B. telephone the project manager or engineer responsible for the plans and specifications for instructions before proceeding with the work.
C. work out a solution to the problem by yourself that will allow a field adaptation of the design error or omission.
D. make a deal with the contractor for a trade-off in exchange for correcting the work.
B
You might also like to view...
The runs of pipe on a pipe layout are shown without any indication of pipe sizes.
Answer the following statement true (T) or false (F)
The M ? N mesh of a polygon mesh can be closed in only one direction, either M or N, but not in both directions
Indicate whether the statement is true or false
Uneven wear across the brake shoe can indicate a bent __________ __________ or a problem with the drum.
Fill in the blank(s) with the appropriate word(s).
Describe the welds required (if any) to join A1 to A2.
Review drawing number 523879C0A and then answer the question.