Written plan dimensions always take precedence over scaled and measured dimensions
Indicate whether the statement is true or false
TRUE
You might also like to view...
To determine when and if a repair is needed, it is suggested that if there is damage that reduces the width of the track or run by ____________________ percent, a repair should be made.
Fill in the blank(s) with the appropriate word(s).
When installing a silt fence, _____.
a. use any available geotextile as long as it is permeable b. bury the bottom edge of the material to a uniform depth c. the job is done after the bottom of the fence has been buried d. the purpose of the fence is to keep people out of the work area
Which of the following is NOT a problem created by modern drainage systems?
a. River flooding b. Ponding c. Degraded water quality
If equals are added to equals, the sums are equal.
Answer the following statement true (T) or false (F)