Which of the following is true for design of telecom rooms? Select all that apply.

A) The owner's IT department should be consulted early regarding specific requirements.
B) Power requirements are fairly consistent among buildings.
C) There are universal standards for space requirements and good layout.
D) The need for reliable power and 24×7 cooling can be reasonably assumed.


A) The owner's IT department should be consulted early regarding specific requirements.
D) The need for reliable power and 24×7 cooling can be reasonably assumed.

Trades & Technology

You might also like to view...

The ____________ is designed to be the “weak link” between the driver, gearbox, or machinery train to prevent serious damage in the event of a malfunction.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

La función de los laboratorios de prueba es:

a. probar productos para garantizar su seguridad y cumplimiento con los estándares establecidos. b. realizar pruebas en áreas con cableado eléctrico instalado para garantizar que el electricista hizo bien el trabajo. c. probar productos nuevos para garantizar que se venden al precio adecuado. d. garantizar que los procedimientos de instalación son seguros para los electricistas.

Trades & Technology

What term describes the movement of electrons from one atom to another?

A) Chain reaction B) Electricity C) Energy transfer D) None of these

Trades & Technology

Before replacing parts such as bits, blades, or discs on any tool, you must _____

a. polish it with a fine steel wool b. recharge the tool's battery c. disconnect the power source d. inspect them for cracks

Trades & Technology