Explain what must be checked even before the start-up procedure is undertaken.
What will be an ideal response?
Prior to beginning a system start-up procedure, it is important to check and verify that the system has been installed according to the manufacturers’ specifications, and that the installation meets local, state, and national codes. Special attention should be given to system grounding.
You might also like to view...
What additional information is shown on a piping and instrumentation diagram that is not on a process flow diagram?
A. Pump capacities B. Control valves C. Equipment symbols D. Equipment numbers
What are Polya's steps to problem solving?
What will be an ideal response?
Which multiethnic empire was first to be weakened by the nationalist uprisings that led to the creation of new nation-states?
a. Czarist Russia b. Austria-Hungary c. Imperial Germany d. the Ottoman Empire
Manual starters are characterized by the fact that the operator must go to the location of the starter to initiate any change of action.
Answer the following statement true (T) or false (F)