What are the three primary items that are the template of competitive bidding?
What will be an ideal response?
The template of competitive bidding is that (1) all sealed bids are received
by a specified date and time, (2) the bids are publicly opened at that time,
and (3) the initial award of the public contract is made on the basis of price
alone.
You might also like to view...
The duties of a construction manager hired by a property owner include all of the following except _____
a. performing construction work b. reviewing construction documents c. paying bills in the owner’s name d. negotiating the contract
Which of the following is true regarding modular wiring systems?
a. Attached fixtures are connected using standard hard wiring methods. b. Modular systems are generally not reusable. c. Modular systems must originate at the service entrance. d. Modular components are color-coded by voltage.
An electron has a positive charge, while a proton has a negative charge.
Answer the following statement true (T) or false (F)
The voltage-generating speed sensor normally uses a three-wire connector and is checked using both and ohmmeter and a voltmeter.
a. true b. false