Bidder "A" wrote its proposal as follows: "concrete --- 300 cu. yds. @ $150.00 = $40,000.00" In the bid evaluation the controlling price would be:

A. $40,000.00 total.
B. $133.00 per cubic yard.
C. $45,000.00 total.
D. $30,000.00 total.


C

Trades & Technology

You might also like to view...

What is the advantage of using FETs as relays in multiplexed truck chassis?

A. they can be switched with small currents B. fast response to control gate signals C. they are inexpensive D. all of the above

Trades & Technology

A driver may be put out of service immediately by law enforcement officers for all of the following EXCEPT:

A. pulling onto scales without a permit B. an hours-of-service violation C. a vehicle that is likely to be involved in an accident or a breakdown D. leaking hazardous materials

Trades & Technology

The full name of an OS&Y valve is __________ valve.

A. open stem and yoke B. outside, shut, and yoke C. outside shield and yoke D. outside stem and yoke

Trades & Technology

Answer the following statement(s) true (T) or false (F)

1. Heat sinks vary in size and shape, but have only one purpose. 2. The purpose of a heat sink is to decrease the surface area of the device connected to it. 3. The surface of the device and heat sink may look perfectly flat to the naked eye. 4. Using thermal compound when heat sinking components is not a necessity. 5. Small heat sinks are generally used when a component is operated at its lowest power rating.

Trades & Technology