Solve the problem.A ceramics workshop makes wreaths, trees, and sleighs for sale at Christmas. A wreath takes 3 hours to prepare, 2 hours to paint, and 9 hours to fire. A tree takes 16 hours to prepare, 3 hours to paint, and 4 hours to fire. A sleigh takes 4 hours to prepare, 13 hours to paint, and 7 hours to fire. If the workshop has 125 hours for preparation time, 58 hours for painting, and 101 hours for firing, how many of each can be made?

A. 8 wreaths, 7 trees, 3 sleighs
B. 6 wreaths, 2 trees, 7 sleighs
C. 7 wreaths, 6 trees, 2 sleighs
D. 2 wreaths, 7 trees, 6 sleighs


Answer: C

Mathematics

You might also like to view...

Find the value of the indicated trigonometric function for an acute angle ? in a right triangle.sin ? = Find sec ?.

A.
B.
C.
D.

Mathematics

Add.234 + 141

A. 573 B. 375 C. 627 D. 555

Mathematics

Solve the problem.Find an ordered pair that satisfies the equation 7x + y = -22 by letting x =-4.

A. (6, -4) B. (-4, -4) C. (-4, 6) D. (-4, -34)

Mathematics

Fill in the blank with one of the words or phrases listed below. A term that is a number only is called a(n) .

A. solution B. numerical coefficient C. variable D. constant

Mathematics