Identify the instruments associated with Rx-202.

What will be an ideal response?


Temperature
TIC-210 Temperature Indicating Controller- located on the cooling water jacket to Rx-202. The temperature is controlled at 120ºF. Temperature on the reactor is measured at the bottom of the reactor.

Pressure
PIC-210 Pressure Indicating Controller- located on the reactor to flare line at the top of the reactor. PCV-210 throttles flow to the flare. Pressure on the reactor is controlled at 85 psig.
Pi-210A Pressure indicator- located on the suction side of pump 210. Pressure typically runs at 88 psig.
Pi-210B Pressure indicator- located on the discharge side of pump 210. Pressure typically runs at 130 psig.

Flow
FIC-210 Flow Indicating Controller- located on the reactor feed inlet line. Flow rates are controlled at 36.5 gallons per minute. Feed composition is 38% liquid catalyst, 61% butane, 1% pentane.
FIC-211 Flow Indicating Controller- located on the solvent feed inlet line. Flow rates are controlled at 68 GPM. The solvent is a critical element of the reaction process. FIC-211 is classified as a Slave or secondary controller.
Fi-210 Flow indicator- located on the pressure control line to the flare. Flow to the flare after start-up is 2.5 cubic feet per minute.

Level
LIC-210 Level Indicating Controller- located on the lower reactor outlet. The level element takes its measurement slightly above the upper agitator blades. Level is controlled at 75%.

Analytical
AT-4 Analyzer transmitter- located on the feed line to the reactor. AT-4 is designed to measure the butane concentration in the feed from tray three. Butane concentration at this point is 61%.
AIC-210 Analyzer Indicating Controller- measures the concentration of butane in the exiting product. AIC-210 is classified as a Master or primary controller. The solvent flow rate is used to control the overall percentage of butane in the reactor product.

Trades & Technology

You might also like to view...

When the rotor is installed in a motor, three leads are brought out from the rotor winding to solid conducting ____.

a. collector rings b. end rings c. slip rings d. bearings

Trades & Technology

To promote good quality control, owners are encouraged to reward employees who _____.

a. obey OSHA regulations b. follow the project schedule c. introduce new or better work methods d. manage unskilled laborers

Trades & Technology

Which of the following is not a dimension of brand equity?

A. Brand loyalty B. Brand range C. Brand awareness D. Brand associations

Trades & Technology

Three forms of energy used in the heating and air conditioning include:

A) Preheat, setpoint, post heat. B) Saturation, subcooling, superheat. C) Electrical, magnetic, mechanical. D) Solid, liquid, and gas.

Trades & Technology