A small manufacturing plant produces three kinds of bicycles-three-speed, five-speed and ten-speed-in two factories. Factory A produces 16 three-speeds, 12 five-speeds and 30 ten-speeds in one day, while factory B produces 15 three-speeds, 18 five-speeds and 20 ten-speeds in one day. An order is received for 30 three-speeds, 40 five-speeds, and 50 ten-speeds. It costs $1200 a day to operate factory A and $3000 a day to operate factory B. The manufacturer chooses the number of days to operate each factory in order to minimize cost.In the situation above, the objective function is

A. 58x + 53y.
B. 1200x + 3000y.
C. 3000x + 1200y.
D. 30x + 40y + 50z.
E. none of these


Answer: B

Mathematics

You might also like to view...

Write the expression in the form a + bi.

A.  - i
B.  + i
C.  - i
D.  + i

Mathematics

What is the measure of each interior angle of a regular nonagon?

What will be an ideal response?

Mathematics

Determine the equation of the graph.

A. y = sec 2x
B. y = sec
C. y = -sec 2x
D. y = -sec

Mathematics

Solve the given equation for x.log3x = 2

A.
B.
C.
D.

Mathematics